Eagle Scout Leadership Project #15

Thomas D'Andre from Troop 167, sponsored by the Good Shepard United Methodist Church, added a critical drainage pipe, landscaping, and a gravel driveway. This is probably one of the most important projects done to date. Housing Building #7 was in dire need due to an erosion problem causing the foundation to be compromised. Water was running to the building on the left side, filtering down to the foundation and washing the dirt out form under it. Potentially the whole building could have collapsed if not addressed. In addition, the grass next to the building was so slippery when wet from rain or dew that a vehicle could not get out. This building has a storage space used for construction materials to support the renovation of Buildings 8 through 10. This project was completed in 2009.

15 Thomas D'Andre.jpg