TJ Quinn from Troop 80, sponsored by the Pleasant Hill Presbyterian Church, completed Phase III of the Outdoor Stage. Eagle Project #25 created the stage, Eagle Project #29 added the handrails and roof. This project added the finishing elements. Once the pressure treated lumber dried it was able to be painted. Also, a paved walk was added behind the stage to the sidewalk, and lastly a new sidewalk was added around the Handicap Ramp. When Eagle Project #16 was built it covered the original sidewalk to the back door of the Chapel and where the future stage would be. This project was completed in 2012.